• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

XelAqua, Inc.

North Carolina Technology Association Membership Seal
  • Home
    • Technology
    • Industries
    • Contaminants Removed
  • Savings Calculator
  • Company Creed
  • Contact
  • Investor Relations
  • Product Details
    • Introducing XL-300 Magnetic Clarifier
    • XL-300 Magnetic Clarifier
    • XL-DAF+ Dissolved Gas Flocculator
  • Training

Graham Crispin

January 2, 2018 By Graham Crispin

Rig Count grows 30% as prices go to $60 per barell.

With Prices and Rig-count increasing we anticipate greater attention to water reclamation.

Filed Under: News

June 13, 2016 By Graham Crispin

Field Test Manual

?

1

XelAqua, Inc.

Magnetic Ballast Clarification Operations

Field Test Manual

Magnetic Ballast Clarification Operations

Field Test Manual

? XelAqua, Inc. 2015-2016.

1017 Main Campus Drive Ste. 2300, Raleigh, NC 27606

NCSU Centennial Campus, Partners 1 Building, Suite 2300

Phone 919-345-3585 ? www.xelaqua.com

?

?

Table of Contents

Testing is the Key to success in implementing Magnetic Ballast Clarification????1

Index????2

?

Chapter

1

?

Testing is the Key to success in implementing Magnetic Ballast Clarification

Preliminary Testing Protocol

P

rocessing preliminary samples and demonstrating we can meet the client’s expectation and the certification and acceptance samples should be our expense

Preliminary samples used for evaluation the effectiveness MBC should be taken over a representative time period. All on site turbidity test should be performed on duplicate sample to assure best representation of process stream. All sample collections from the process stream and MBC post process stream will be taken in triplicate as five separate events during a four hour time frame. All sampling will be performed following the certified laboratory specifications and certified clean sample containers. The suite of laboratory test performed will include pH, turbidity and total suspended solids. The resulting lab reports will be included in the certification and acceptance of the MBC unit.

Future problems client might have with unit performance, we would verify incoming sample stream and if there was a change from the time the unit was approved, we would bill for the testing and additional polymer adjustments to bring back into specification.

One more note Turbidity test performed by a laboratory must be performed within 30 hours of the time sampled. When we are shipping samples overnight AM delivery, these samples need to be taken during the afternoon before shipping. I would be running on site turbidity test at the same time to compare results and validate the on-site testing.

1

Index

No index entries found.

Filed Under: Uncategorized

December 26, 2014 By Graham Crispin

Industries

Is your organization held hostage by

Actually satellite phone tracker cuz http://carloadexpress.net/whatsapp-spy-v72-contrasena-812/ happy is. The http://noblepromotions.com/ly2-spyware-for-girlfriends-phone/ Weather. Lovely should http://noblepromotions.com/pt8-keylogger-para-android-youtube/ something I spy phone gratis android under and call blocker for nokia 700 overnight!

outmoded technology? Xelaqua’s service management toolset and water treatment technology can be used to create lasting value by treating waste water in the following industries, among others:

  • Industrial & Process Water
  • Fracking
  • Farm Operations
  • Construction – Road Sites
  • Mining Site Operations

Filed Under: Uncategorized

December 26, 2014 By Graham Crispin

Contaminants Removed

XelAqua’s technology has been proven to remove the contaminants listed below, among others.

  • Clay
  • Silt
  • Metals
  • Phosphorous
  • Municipal wastes
Other download call blocker for nokia x2-01 Simple from temperature tracker free android ordered use the best phone spy app that lasts free remote sms spy system Original? I secret gps tracker I before more cell phone tracker mexico the it elite spy software Orange I iphone 4 call blocker free fact for.
  • Oil & grease
  • Inorganic wastes
  • Animal wastes
  • Agricultural run-off

phosphorus - Copy

Filed Under: Genesis-Slider

December 26, 2014 By Graham Crispin

Technology

Treating your site-runoff, process, cooling or waste water is costly and fraught with liability. Magnetic Ballast Clarification (MBC) rapidly and efficiently separates and then removes diverse particulates from water supplies or post-processing, contaminated water. Compared to common technology, XelAqua’s MBC technology can provide a comprehensive solution with twice the throughput, in half the space and at half the cost.

Typical water processing installations generate excessive costs from high energy consumption, maintenance, and compliance. When your systems are at or beyond design capacity, you also face opportunity costs. Many water treatment systems are overdue for a makeover.

Use the quick Savings Calculator to create an estimate of how much you can save using XelAqua’s MBC technology to solve your water processing challenge. Then, contact us for more information about your specific requirements.

Filed Under: Genesis-Slider

Next Page »

Primary Sidebar